Jatim Times Network

Installation Manual - Thyssenkrupp Levant Stair Lift

Drive the connecting joint bolts through the pre-drilled internal splice bars. Tighten them sequentially to ensure the transition gap between the two rails is completely flush. Any misalignment here will cause a noticeable bump or structural wear when the carriage traverses the joint. Step 3: Positioning the Mounting Brackets

Insert and turn the key; verify internal battery connections. A safety edge sensor is obstructed or stuck. Inspect footrest and carriage edges for debris or binding. Beeping sound when parked. Lift is not making contact with charging strips.

What are you currently seeing?

Check all edges around the footrest and carriage for obstructions. What is the of your staircase rail?

Overview of the Thyssenkrupp Levant Installation Manual Steps

Run the thin electrical wire from the power transformer along the back channel of the rail, clipping it securely out of the way of any moving parts. Connect the positive and negative leads to the respective terminals on the charging blocks.

--- Iklan Sponsor ---